Drag the map or use pan buttons to move. Tab to a node or connection and press Enter to inspect its evidence. Arrows follow the actual claim direction.
CompanyChip / productTechnologyPlace / facility
Select a connection for its evidence
Relationships & evidence (2)
Every displayed connection is a scoped claim. Arrows follow subject to object.
Listed distribution component at the pinned README revision; availability depends on the upstream release and supported platform. Component license is not replaced by the distribution license.
The OSS CAD Suite README lists Yosys among its distribution components.
Location: Pinned README.md line 33: RTL synthesis
Published
Not stated
Retrieved
2026-10-13
Store factual paraphrases, metadata, source-byte SHA-256 and pinned document link only. Source bytes were fetched for this review but are not retained or redistributed. Repository and component licenses remain separate. Commit date is not document publication or relationship validity.
The OpenROAD Project · Tier A · Primary source · supports
The ORFS flow diagram assigns logic synthesis to Yosys.
Location: Pinned README.md line 19: RTL synthesis
Published
Not stated
Retrieved
2026-10-13
Store factual paraphrases, metadata, source-byte SHA-256 and pinned document link only. Source bytes were fetched for this review but are not retained or redistributed. Repository and component licenses remain separate. Commit date is not document publication or relationship validity.
A path retains its original claims. Shared technology does not establish a supply contract.
3 nodes · 2 claimsScope
Relationships may describe different dates. A path does not establish simultaneous activity. Bounded source-backed collection. Missing or filtered connections do not establish absence. Supported does not mean independently verified.