ibex pinned upstream documentation
Ibex README describes Yosys area evaluation using its basic synthesis flow and latch-based register file. No area figures are republished.
- Published
- Not stated
- Retrieved
- 2026-10-13
4 entities and 3 documented connections shown.
Drag the map or use pan buttons to move. Tab to a node or connection and press Enter to inspect its evidence. Arrows follow the actual claim direction.
| Subject | Relationship | Object | Status | Evidence |
|---|---|---|---|---|
| Ibex | Yosys | SUPPORTEDValidity dates not established | Why are these connected?Ibex README describes Yosys area evaluation using its basic synthesis flow and latch-based register file. No area figures are republished. ibex pinned upstream documentationIbex README describes Yosys area evaluation using its basic synthesis flow and latch-based register file. No area figures are republished.
| |
| Ibex | Verilator | SUPPORTEDValidity dates not established | Why are these connected?Ibex Simple System simulation example requires Verilator; this is a specific example, not a guarantee for every Ibex configuration. ibex pinned upstream documentationIbex Simple System simulation example requires Verilator; this is a specific example, not a guarantee for every Ibex configuration.
| |
| Ibex | FuseSoC | SUPPORTEDValidity dates not established | Why are these connected?The Simple System simulator build described here is driven by FuseSoC. ibex pinned upstream documentationThe Simple System simulator build described here is driven by FuseSoC.
|
From FuseSoC · up to two relationship steps.
A path retains its original claims. Shared technology does not establish a supply contract.
Relationships may describe different dates. A path does not establish simultaneous activity. Bounded source-backed collection. Missing or filtered connections do not establish absence. Supported does not mean independently verified.