Skip to main content
VLSI Korea

Semiconductor graph

KLayout
Methods ↗

2 entities and 1 documented connections shown.

Connections

2 entities · 1 claims
100%

Drag the map or use pan buttons to move. Tab to a node or connection and press Enter to inspect its evidence. Arrows follow the actual claim direction.

STARTING ENTITYDIRECT CONNECTIONSUses tool · SUPPORTEDUses toolKLayout · eda toolEDA TOOLSTARTKLayoutOpenROAD Flow Scripts · open source projectOPEN SOURCE PROJECTOpenROAD FlowScripts
CompanyChip / productTechnologyPlace / facility
Select a connection for its evidence
Relationships & evidence (1)
Every displayed connection is a scoped claim. Arrows follow subject to object.
SubjectRelationshipObjectStatusEvidence
OpenROAD Flow ScriptsKLayoutSUPPORTEDValidity dates not established
Why are these connected?

KLayout is documented for the finishing stage. This is not a verified signoff result.

OpenROAD Flow Scripts README

The OpenROAD Project · Tier A · Primary source · supports

The ORFS flow diagram assigns GDSII generation and DRC/LVS checks to KLayout.

Location: Pinned README.md line 43: GDSII generation and layout checks

Published
Not stated
Retrieved
2026-10-13

Store factual paraphrases, metadata, source-byte SHA-256 and pinned document link only. Source bytes were fetched for this review but are not retained or redistributed. Repository and component licenses remain separate. Commit date is not document publication or relationship validity.

Full claim history →
Find an evidence path

Find a documented path

From KLayout · up to two relationship steps.

A path retains its original claims. Shared technology does not establish a supply contract.

2 nodes · 1 claims
Scope

Relationships may describe different dates. A path does not establish simultaneous activity. Bounded source-backed collection. Missing or filtered connections do not establish absence. Supported does not mean independently verified.