Skip to knowledge
VLSI Hub / Knowledge

Knowledge / fab

TSMC Arizona Second Fab

Canonical entity with source-backed relationships and retained history.

urn:vlsi:entity:98cdc862-0dd5-47bb-845b-13e435b9bf14

Clear dates

A source-reported date is a historical snapshot. Unknown validity is excluded when a date is selected. “Known to VLSI” uses the end of that UTC day. This entity’s heading uses its current label.

Recorded relationships

SUPPORTED1 evidence record · Revision 1

TSMC Arizona Second FabLocated inUnited States

Physical fab project in the United States.

Validity dates not established

Inspect evidence, confidence and history

Evidence index 85/100 · A rule-based index, not the probability this claim is true. 1 independent source origin(s).

The source does not establish exact validity bounds; retrieval time is recorded separately.

TSMC Arizona

TSMC · Tier A · Primary source · supports

Evidence summary: TSMC locates its Arizona project in the United States.

Location: Key Milestones — Second Fab

Published: not stated · Retrieved: 2026-09-08 · Extraction: manual-source-review

Store factual paraphrase, metadata and link only. No source document redistribution or inferred license; no source bytes retained.

First observed by VLSI: 2026-09-08T15:57:21.457Z. No independent human verification recorded.

Review: Evidence ingested by curated-primary-sources/1.0.0. Country location does not prove any chip is made here.

Full claim history →
RETRACTED1 evidence record · Revision 2

TSMC Arizona Second FabOperated byTSMC

TSMC Arizona fab project; operator association.

Validity dates not established

Inspect evidence, confidence and history

Evidence index 85/100 · A rule-based index, not the probability this claim is true. 1 independent source origin(s).

The source does not establish exact validity bounds; retrieval time is recorded separately.

TSMC Arizona

TSMC · Tier A · Primary source · supports

Evidence summary: TSMC identifies this fab as part of its Arizona project.

Location: Key Milestones — Second Fab

Published: not stated · Retrieved: 2026-09-08 · Extraction: manual-source-review

Store factual paraphrase, metadata and link only. No source document redistribution or inferred license; no source bytes retained.

First observed by VLSI: 2026-09-08T15:57:21.457Z. No independent human verification recorded.

Review: Project association is not proof of the current operating entity. Retain project location and planned capability; operator remains unresolved.

Full claim history →
SUPPORTED1 evidence record · Revision 1

TSMC Arizona Second FabLocated inArizona

Physical fab project in Arizona.

Validity dates not established

Inspect evidence, confidence and history

Evidence index 85/100 · A rule-based index, not the probability this claim is true. 1 independent source origin(s).

The source does not establish exact validity bounds; retrieval time is recorded separately.

TSMC Arizona

TSMC · Tier A · Primary source · supports

Evidence summary: TSMC identifies the second fab as part of its Arizona project.

Location: Key Milestones — Second Fab

Published: not stated · Retrieved: 2026-09-08 · Extraction: manual-source-review

Store factual paraphrase, metadata and link only. No source document redistribution or inferred license; no source bytes retained.

First observed by VLSI: 2026-09-08T15:57:21.457Z. No independent human verification recorded.

Review: Evidence ingested by curated-primary-sources/1.0.0. No installed-tool or manufactured-product inference.

Full claim history →
SUPPORTED1 evidence record · Revision 1

TSMC Arizona Second FabPlanned processTSMC N3

Second Arizona fab planned N3 capability.

Planned relationship. This source does not establish completed production.

Validity dates not established

Inspect evidence, confidence and history

Evidence index 85/100 · A rule-based index, not the probability this claim is true. 1 independent source origin(s).

The source does not establish exact validity bounds; retrieval time is recorded separately.

TSMC Arizona

TSMC · Tier A · Primary source · supports

Evidence summary: The current project page targets N3 volume production for the second half of 2027.

Location: Key Milestones — Second Fab

Published: not stated · Retrieved: 2026-09-08 · Extraction: manual-source-review

Store factual paraphrase, metadata and link only. No source document redistribution or inferred license; no source bytes retained.

First observed by VLSI: 2026-09-08T15:57:21.457Z. No independent human verification recorded.

Review: Evidence ingested by curated-primary-sources/1.0.0. Forward-looking target, not an operating-status claim.

Full claim history →